Monday, June 29, 2015

- YouTube - Finishing Geocache HQ Exterior


A new World of RAAR video has been posted. Watch as Talamer completes the exterior of Geocaching Headquarters, builds a simple weather machine and provides the some RAAR news. Check it out below!




Thursday, June 25, 2015

- SNEAK PEEK - Silverfisch's Department Store

Silverfisch's Department Store is still under construction by Sam Co.




Wednesday, June 24, 2015

- YouTube - Horse Stable Walkthrough Ep. 13





Hello Crafty Miners! It's been a crazy week so in case you missed it, check out the latest World of RAAR YouTube video featuring Lady TNT's Horse Stable. It's a fantastic building and watch out for the meowing chicken.




Monday, June 22, 2015

- SNEAK PEEK - Whistlestop

Here's a quick look at the latest little town in the west, Whistlestop.




Wednesday, June 17, 2015

- SPOTLIGHT - Tri-C Engineering Office

Welcome back all you Crafty Miners to the World of RAAR. This week we Spotlight the newly constructed Tri-C Engineering office located on the third and forth floors of the magnificent Tri-C Tower. So let's get to it.



Tri-C Engineering was originally founded by Talamer after envisioning a city located around the first settlement in the RAAR world. Since that time, Tri-C Engineering has gone on to design and build structural feats within Imperial City such as the Grand Central Train Station, Imperial Plaza, City Hall and the location of its new office, Tri-C Tower.

Reception
Reception
Originally the office was located on the top three floors of Imperial Plaza, however space limitations made it necessary for a larger location. After much design, Tri-C Tower was erected next door to Imperial Plaza and before long the new office was being laid out.

As soon as the elevator doors open, clients and employees are greeted with the reception and waiting area. After passing through the reception area, there is a lunch room and break area for employees to socialize and collaborate with each other. Stairs located next to the lunch room lead to the company administration where Mayor Talamer still maintains an office. The rest of floor three is reserved for the drafting and design group which head up the various construction and engineering projects. The copy room is located adjacent to the design area and provides employees with quick access to company resources and scanners.

Lunch Room

With the final touches being put in place, Tri-C Engineering plans to move its employees next Monday morning, just in time to continue the hectic workload that is still ahead of them.

Drafting Department

We hope you have enjoyed our look at the Tri-C Engineering Office and hope it has given you some ideas for your builds. To see more of these inspiring builds be sure to check out our pinterest page and our YouTube page . Keep up the awesome support and thank you for helping us grow by sharing with your friends and family. Every view, click and comment is greatly appreciated and helps us to bring you more content. Take care and until we meet again, Happy Crafting!


~RAAR News Team

Copy Room

Wednesday, June 10, 2015

-SPOTLIGHT- Grimshire Harbor




Hello Crafty Miners! Welcome to another edition of Spotlight. This week we travel back into the land of Jursammic Park to explore the freshly built Grimshire Harbor. So, let's get to it.


With the completion of Port Davies in Imperial City, the town of Grimshire also decided a harbor was needed in order to access the world trade. Sam Co. architects took to the job in early spring designing a dock, crane and warehouse that would both suit the needs of the citizens and match the unique design style of the town.

Once the design was complete, Sam Co. Construction crews prepared the site and began to construct the new port. Once the crane and warehouse were complete, spruce piles were driven into the sea bed to support the dock platform.

Not long after the completion of the dock, ships began to pour into the new access point allowing Grimshire to begin to import and export their wares.












The tall ship seen docked below was specially designed by Sam Co. owner, SammyMacman. It was launched from Macwood in late spring and has already done several transport runs between the two cities. More ships are expected to be commissioned before too long. Rumor has it a shipyard is in the initial planning stages in Imperial City.


Thanks for your likes and comments. Please be sure to join the World of RAAR community page so you can receive future updates a day early, see sneak peeks of current builds, and participate in suggesting build ideas. Have a great week and until we meet again, Happy Crafting!







Monday, June 8, 2015

-SNEAK PEEK- TIELAND Amusement Park

The entrance to the TIELAND amusement park has been completed. 

What rides do you think should be built?